Wednesday, January 1, 2014

I'm back from a 2 month holiday in Japan ( see my OnsenJohn blog) and have been busy on my Sargents roundhouse project.

This is one of the 2 center beams, you add legs and top beam to both sides to thicken it and to also to have locating tabs on the legs and the ends
 
The sides get doubled up, make sure you add them to the interior side! 


Here, I'm glueing the 2 center supports to the front wall support. I haven't glued the supports to the floor yet, as I will need to cut out the pit floors and locate the floor to the layout later.



Make sure the joints are tight

 
All the interior walls are done !
I've sanded the tops of the beams to make sure the roof will have a nice surface to mate too.
Need to touch up some stain
 
Today, I'll be adding the exterior walls (maybe)


No comments:

Post a Comment